Order backlog

The order backlog at September 30, 2014, was as follows:

(Salini Impregilo’s share in millions of euros)

Region/CountryProjectResidual backlog at September 30, 2014% of the totalCompletion progress (%)
High Speed  4,244.3 19.8%  
Italy Mestre Bypass Salerno-Reggio di Calabria  6.7 0.0% 98.3%
Italy Highway, Lot 5 Salerno-Reggio di Calabria  27.3 0.1% 95.7%
Italy Highway, Lot 6 Salerno-Reggio di Calabria  28.0 0.1% 89.8%
General Contracting  62.0 0.3%  
Italy State Highway 36 connector   4.8 0.0% 98.4%
Italy Spriana Landslide  2.0 0.0% 95.2%
Italy Pedemontana Lombarda - Lot 1  23.7 0.1% 94.5%
Italy A4 building of third lane   9.8 0.0% 88.4%
Italy Milan Metro M4  437.3 2.0% 9.5%
Italy State Highway 106 Ionica  308.8 1.4% 2.4%
Italy Broni - Mortara  981.5 4.6% 0.0%
Italy Port of Ancona  223.5 1.0% 0.0%
Italy Isarco underpass  123.5 0.6% 0.0%
Italy Metro B  948.3 4.4% 0.1%
Italy Metro B1  4.2 0.0% 98.2%
Italy SGF   4.3 0.0% n.d.
Italy other  2.9 0.0% n.d.
Other projects in Italy  3,074.6 14.3%  
Total projects in Italy     7,380.9 34.4%  
Greece Achelos Support Tunnel  0.3 0.0% 95.2%
Greece Thessaloniki Metro  223.6 1.0% 30.8%
Greece Stavros Niarchos Cultural Center  96.4 0.4% 42.1%
Romania Orastie-Sibiu Highway  28.1 0.1% 84.7%
Romania Lugoi - Deva  119.8 0.6% 6.0%
Poland Road S8 Marki - Radzymin Lot 1  80.5 0.4% 0.0%
 
Slovakia Lietavska Lucka - Visnove - Dubna Skala  307.1 1.4% 0.1%
Turkey Gaziantep  135.5 0.6% 0.0%
Turkey Kosekoy - Gezbe  10.1 0.0% 94.7%
Denmark Cityringen  782.4 3.6% 52.8%
Austria Brenner Tunnel  184.9 0.9% 0.0%
Switzerland Transalp Tunnel (Tat)  6.1 0.0% 98.3%
Switzerland CSC  118.7 0.6% 82.6%
Dominican Republic Acquedotto Oriental Consortium   0.9 0.0% 99.4%
Dominican Republic Guaigui hydraulic system  71.4 0.3% 15.7%
Venezuela Puerto Cabello – La encrujada Ferrocarriles  485.6 2.3% 69.5%
Venezuela Puerto Cabello – La encrujada Ferrocarriles stations  341.9 1.6% 18.9%
Venezuela Chaguaramas Railway   102.4 0.5% 59.8%
Venezuela San Juan de Los Morros Railway  302.7 1.4% 45.2%
Venezuela OIV Tocoma  28.8 0.1% 97.4%
Panama Widening of the Panama Canal  156.4 0.7% 86.4%
Chile Angostura   0.1 0.0% 100.0%
Chile Metro Santiago  54.3 0.3% 56.3%
Colombia Sogamoso  1.0 0.0% 99.8%
Colombia Quimbo  27.8 0.1% 88.8%
Colombia Ruta del Sol Highway  342.7 1.6% 18.3%
Brazil Serra Do Mar  -  0.0% 100.0%
USA Vegas Tunnel - Lake Mead  81.5 0.4% 78.7%
USA San Francisco Central Subway  6.8 0.0% 91.7%
USA Gerald Desmond Bridge  121.5 0.6% 21.8%
USA Anacostia River Tunnel  108.5 0.5% 16.3%
Argentina Riachuelo  341.8 1.6% 0.0%
Peru Metro Lima  608.7 2.8% 0.0%
America SGF  1.0 0.0% n.d.
Arab Emirates Abu Dhabi - Dubai Highway  21.8 0.1% 0.0%
Qatar Abu Hamour  66.5 0.3% 24.6%
Qatar Red Line North  705.7 3.3% 6.9%
Saudi Arabia Metro Ryiadh  1,064.6 5.0% 2.5%
Kazakhstan Kizylorda (S)  12.6 0.1% 96.0%
Kazakhstan Almaty - Khorgos (S)  108.6 0.5% 17.5%
Malaysia Ulu Jelai  173.2 0.8% 72.4%
Australia NW Rail Link Project  215.1 1.0% 8.4%
Nigeria Suleja Minna road  19.6 0.1% 70.6%
Nigeria Adiyan waterworks phase II  189.7 0.9% 17.6%
Nigeria District 1 – Abuja North phase IV  190.1 0.9% 14.9%
Nigeria Isex  8.0 0.0% 88.6%
Nigeria Cultural Center  244.7 1.1% 39.8%
Nigeria Idu  75.7 0.4% 70.4%
Nigeria Gurara Dam  41.5 0.2% 92.6%
Nigeria Ogoni  17.2 0.1% 90.7%
Libya Lidco 1.111,40 5.2% 12.3%
Libya Libyan Coastal Highway  639.3 3.0% 0.0%
Libya Kufra Urbanizzazione  211.5 1.0% 0.0%
Libya Kufra airport  48.6 0.2% 15.4%
Libya Tripoli Airport  99.4 0.5% 0.0%
South Africa Ingula  40.7 0.2% 90.2%
Ethiopia Gerd  2,459.1 11.5% 31.6%
Ethiopia Gibe III  320.5 1.5% 79.6%
Zimbabwe Mukorsi Dam  30.2 0.1% 81.6%
Sierra Leone Matotoka  14.1 0.1% 36.3%
Sierra Leone Rehabilitation of urban road  -  0.0% 100.0%
Sierra Leone Operation & Maintenance  -  0.0% 100.0%
Namibia Neckartal Dam  166.7 0.8% 11.3%
Africa SGF - Il nuovo Castoro  7.0 0.0% n.d.
 Fisia Italimpianti   28.9 0.1% n.d.
Total international projects     13,611.3 63.4%  
Total portfolio CONTINUING OPERATIONS  20,992.2 97.8%  
Total portfolio Costruzioni Todini  469.6 2.2% n.d.
Total portfolio other projects and discontinued operations  469.6 2.2%  
Total Group backlog at SEPTEMBER 30, 2014 21,461.8 100.0%  

For information about the order backlog of the Libyan company Impregilo Lidco Libya General Contracting Company, totalling € 1,111.4 million, see the “Segment’s risk areas” section of this Report.