Order Backlog

The order backlog at June 30, 2015, was as follows:

(Shares in millions of euros)

Region/Country Project Residual backlog at June 30, 2015 % of the total Completion progress (%)
High Speed/ High Capacity  5,762.8 22.1%  
Italy Mestre Bypass  0.6 0.0% 99.8%
Italy Highway, Lot 5 Salerno-Reggio Calabria  30.4 0.1% 97.5%
Italy Highway, Lot 6 Salerno-Reggio Calabria  25.0 0.1% 95.4%
General Contracting  56.0 0.2%  
Italy State Highway 36 connector 36  2.9 0.0% 99.0%
Italy Spriana Landslide  2.1 0.0% 95.5%
Italy Pedemontana Lombarda - Lot 1  9.8 0.0% 97.8%
Italy A4 building of third lane  0.5 0.0% 99.4%
Italy Milan Metro M4  417.3 1.6% 14.4%
Italy State Highway 106 Ionica  337.6 1.3% 2.5%
Italy Broni - Mortara  981.5 3.8% 0.0%
Italy Port of Ancona  223.5 0.9% 0.0%
Italy Isarco underpass  122.0 0.5% 1.3%
Italy Metro B  946.3 3.6% 0.1%
Italy Metro B1  0.4 0.0% 99.8%
Italy SGF  0.5 0.0% n.a.
Italy other  0.8 0.0% n.a.
Other projects in Italy  3,045.2 11.7%  
Total projects in Italy    8,864.0 33.9%  
Greece Achelos Support Tunnel  0.2 0.0% 96.8%
Greece Thessaloniki Metro  220.9 0.8% 32.2%
Greece Stavros Niarchos Cultural Center  98.5 0.4% 68.1%
Romania Orastie-Sibiu Highway  3.6 0.0% 98.0%
Romania Lugoi Deva  104.4 0.4% 20.4%
Poland S3 Nowa Sol  109.2 0.4% 1.9%
Poland S7 Checiny  115.0 0.4% 0.8%
Poland Road S8 Marki - Radzymin Lot 1  64.1 0.2% 2.5%
Slovakia Lietavska Lucka - Visnove - Dubna Skala  298.8 1.1% 2.8%
Turkey Gaziantep  137.8 0.5% 0.5%
Turkey Kosekoy  12.1 0.0% 93.8%
Turkey Cetin hydroelectric project  233.1 0.9% 3.9%
Denmark Cityringen  754.4 2.9% 61.1%
Austria Brenner Tunnel  167.3 0.6% 9.5%
Switzerland CSC  109.2 0.4% n.a.
Works in Europe    2,428.6 9.6%  
Dominican Republic Acquedotto Oriental Consortium  1.0 0.0% 99.4%
Dominican Republic Guaigui hydraulic system  81.0 0.3% 14.7%
Venezuela Puerto Cabello - Contuy Ferrocarriles  162.4 0.6% 88.0%
Venezuela Puerto Cabello - Contuy Ferrocarriles stations  378.3 1.4% 18.1%
Venezuela Puerto Cabello Integral system  316.7 1.2% 0.0%
Venezuela Chaguaramas Railway  93.9 0.4% 62.2%
Venezuela San Juan de Los Morros Railway  282.2 1.1% 47.3%
Venezuela OIV Tocoma  150.0 0.6% 89.3%
Chile Metro Santiago  27.6 0.1% 74.1%
Colombia Sogamoso  4.8 0.0% 99.2%
Colombia Quimbo  23.9 0.1% 93.0%
Colombia Autostrada Ruta del Sol  544.5 2.1% 26.0%
Brasil Serra Do Mar  2.4 0.0% 97.8%
Brasil Carvalho Pinto Consortium  4.0 0.0% 15.8%
Peru Lima Metro  649.6 2.5% 1.2%
USA Vegas Tunnel - Lake Mead  38.6 0.1% 90.2%
USA San Francisco Central Subway  15.8 0.1% 83.8%
USA Gerald Desmond Bridge  147.1 0.6% 27,0%
USA uAnacostia  89.7 0.3% 36.7%
USA Dugway Storage Tunnel Cleveland  132.9 0.5% 2.8%
Argentina Riachuelo  375.0 1.4% 2.4%
Works in Amererica    3,521.4 16,0%  
Arab Emirates Tristar Jv - subcontract  7.1 0.0% 54.2%
Arab Emirates Tristar Jv - subcontract  49.3 0.2% 24.6%
Arab Emirates R881  0.6 0.0% 99.7%
Qatar Abu Hamour  50.0 0.2% 55,2%
Qatar Red Line North  1,764.5 6.8% 16.6%
Saudi Arabia Metro Ryiadh  2,877.4 11.0% 4.0%
Kazakhstan Almaty - Khorgos (S)  102.3 0.4% 38.4%
Malaysia Ulu Jelai  98.7 0.4% 85.6%
Works in Asia    4,949.9 9.6%  
Australia NW Rail Link Project  175.3 0.7% 34.9%
Works in Australia    175.3 0.7%  
Algeria Algeri intermunicipal  0.6 0.0% 99.2%
Nigeria Neckartal Dam  168.0 0.6% 26.1%
Nigeria Suleja Minna  117.3 0.4% 28.9%
Nigeria Inner Northern Expressway  33.5 0.1% 0.0%
Nigeria Adiyan  163.8 0.6% 31.8%
Nigeria District 1  205.4 0.8% 12.6%
Nigeria Isex  9.5 0.0% 87.5%
Nigeria Cultural Center  265.3 1.0% 36.2%
Nigeria Idu  62.2 0.2% 75.5%
Nigeria Gurara  7.7 0.0% 98.7%
Nigeria Ogoni  27.2 0.1% 86.0%
Libya Lidco  1,124.8 4.3% 12.8%
Libya Libyan Coastal Highway  1,101.3 4.2% 0.1%
Libya Kufra Urbanization  238,7 0.9% 0.4%
Libya Kufra airport  55.4 0.2% 14.9%
Libya Tripoli Airport  99.4 0.4% 0.0%
South Africa Ingula  23.2 0.1% 94.9%
Ethiopia Gerd  2,228.3 8.5% 40.7%
Ethiopia Gibe III  139.0 0.5% 91.4%
Zimbabwe Mukorsi Dam  10.4 0.0% 93.4%
Sierra Leone Matotoka  15.0 0.1% 55.1%
Sierra Leone Rehabilitation of urban road  2.3 0.0% 94.9%
Sierra Leone Operation & Maintenance  5.5 0.0% 86.2%
Sierra Leone Bumbuna  1.9 0.0% 50.6%
Tunisia SFAX-GABES  32.0 0.1% 71.6%
Tunisia Oued Zarga Boussalem  18.5 0.1% 59.5%
Africa SGF - Il nuovo CastoroN  14.0 0.1% n.a.
Works in Africa    6,170.2 29.1%  
Fisia Italimpianti   22.4 0.1% n.a.
Total Works Abroad    17,267.8 66.1%  
Total portfolio CONTINUING OPERATIONS  26,131.8 100.0%  
Total Group backlog at June 30, 2015  26,131.8 100.0%  

With reference to the order backlog concerning the Libyan orders/projects, totalling € 2,628.6, please refer to what has been specified in the "Risk Areas and Litigation" section.